How to fill out the WH-347
To fill out the WH-347, enter the contractor and project information at the top, then add one row per worker per classification with their daily hours, rates, deductions and net pay. Page 2 is the Statement of Compliance, where the contractor or its agent certifies the payroll is correct and signs. The form must be submitted weekly for each week any covered work was performed (29 CFR 5.5(a)(3)(ii)).
Step-by-step instructions for the January 2025 WH-347 certified payroll form (OMB 1235-0008, expires 01/31/2028), with a worked example.
Contractors and subcontractors on federal and federally assisted construction submit certified payroll every week under the Davis-Bacon and Related Acts (29 CFR 5.5(a)(3)(ii)). The WH-347 is the standard form. Using it is optional, but the information it collects is required.
These instructions follow the January 2025 revision of the form. If you have an older version, see what changed in 2025.
Step 1: Fill out the header
| Field | What to enter |
|---|---|
| Submission of final DBRA certified payroll | Leave blank unless this is the last payroll for the contract. Tick it on the final payroll only. |
| Prime contractor / Subcontractor | Tick one. If you are both the prime and filing for yourself, tick Prime contractor. |
| Name and address | The legal name and address of the contractor or subcontractor whose workers are on this payroll. |
| Certified payroll no. | Start at 1 for the first week of work on the contract and number each payroll in order. No-work weeks get their own number. |
| Week ending | The Saturday date of the work week (or the last day of the pay period if different). |
| Project and location | The project name, contract or project number, and the site address (at least city, county and state). |
| Wage determination no. | The determination number and modification from the contract. If more than one applies, list them all. |
Step 2: Enter each worker
One row per worker per classification. If a worker performed two different classifications in the same week (for example, carpenter and laborer), they appear on two rows with the same worker entry number.
| Column | What to enter |
|---|---|
| 1A Worker entry no. | Number the workers 1, 2, 3 in order. A worker on two rows keeps the same number. |
| 1B Last name | The worker's last name. |
| 1C First name | The worker's first name. |
| 1D Middle initial | Middle initial, if any. |
| 1E Worker identifying no. | An employee number or the last four digits of the SSN. Never the full SSN. |
| 2 J or RA | J for journeyworker. RA for registered apprentice. |
| 3 Labor classification | The classification from the wage determination that matches the work performed. |
| 4 Hours worked each day | Two rows per day: ST (straight time) and OT (overtime). Record only hours worked on this project. |
| 5 Total hours | Total ST hours and total OT hours for the week. |
| 6A Hourly rate paid | ST rate and OT rate. The OT rate must be at least 1.5 times the basic hourly rate from the determination (the fringe portion is not multiplied). |
| 6B Total fringe benefit credit | The total contributions to bona fide fringe benefit plans for the week. Must match the hourly credit on page 2 times the total hours. |
| 6C Payment in lieu of fringe benefits | Cash paid to the worker instead of contributions to plans, for the week. |
| 7A Gross amount earned | Gross pay for work on this project. |
| 7B Gross for all work | Total gross for all projects that week (may equal 7A if the worker was only on this project). |
| 8 Deductions | FICA, federal tax, state tax, any other withholding (name each one), and total deductions. |
| 9 Net pay for all work | Gross for all work minus total deductions. |
Step 3: Fill out page 2 (Statement of Compliance)
Page 2 is the Statement of Compliance. The signer ticks each certification and signs. See the Statement of Compliance guide for details on each checkbox, including fringe benefit plan information.
Worked example
Three workers on a highway project in Denver, CO. Wage determination CO20250001 Mod 0. Week ending Saturday, March 15, 2025.
| 1A | Name | 2 | 3 | ST hrs | OT hrs | ST rate | OT rate | 6B Fringe credit | 6C Cash | 7A Gross |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Garcia, Maria | J | Carpenter | 40 | 4 | $32.50 | $48.75 | $656.48 | $0.00 | $1,495.00 |
| 2 | Nguyen, David | J | Laborer Group 1 | 40 | 0 | $28.00 | - | $0.00 | $520.00 | $1,120.00 |
| 3 | Johnson, Tyler | RA | Carpenter Apprentice 2nd yr | 32 | 0 | $22.75 | - | $427.84 | $0.00 | $728.00 |
In this example:
- Garcia worked 4 hours of overtime. The OT rate is 1.5 times the basic hourly rate ($32.50 x 1.5 = $48.75). The fringe is not multiplied for overtime.
- Nguyen receives fringes as cash in lieu (column 6C), not through a plan. $520.00 = 40 hours x $13.00/hour fringe rate.
- Johnson is a registered apprentice (RA) paid at the 2nd-year apprentice rate. The apprentice guide covers ratios and what to attach.
- Garcia's fringe credit: $656.48 = (40 + 4) hours x $14.92/hour contributed to plans.
FAQ
Is the WH-347 required?
Using the WH-347 form itself is optional, but submitting the information it asks for is required on Davis-Bacon and Related Acts contracts (29 CFR 5.5(a)(3)(ii)). Most agencies accept the WH-347 and many require it by contract.
What is a worker entry number on the WH-347?
A sequential number (1, 2, 3...) assigned to each worker in column 1A. If a worker appears twice for two classifications, they keep the same number on both lines. This was added in the January 2025 revision.
Certified Payroll App fills the WH-347 from your payroll export, checks rates against the wage determination and signs electronically. Get started (Starter $79/month).